Skip to main content

Client
FC Bayern München eV

Project duration
2017 – 2018

The effects of the capacity increase

Requirements

The Audi Dome is the home venue of the FC Bayern basketball team. Due to increased spectator demand, plans were made to increase capacity from 6,791 to 7,600 seats, convert the press area into catering and retail space on the first floor, and convert the staff and ancillary rooms to the press area with an outside staircase in the basement.

In the feedback regarding the building application, it was stated that “increasing the capacity of the sports hall, based on past experiences, will also result in an increase in pedestrian and vehicular traffic. The compatibility of the future traffic volume, as well as the management of the anticipated parked vehicles within the existing road and path network, needs to be demonstrated through expert assessment.”

Implementation

To assess the current situation, Companeer conducted traffic observations and provided a qualitative description of the capacities and utilization of both moving and parked traffic. This information served as a basis for estimating the potential impacts of the capacity increase.

Our services

  • Preliminary examinations and on-site observations on the day of the match
  • Evaluation and assessment of the observations
  • Development of measures to improve traffic management
  • Creation of a traffic expertise for the building application

Contact & Imprint

Companeer GmbH
Parkstr. 22 | 80339 Munich
Phone +49 (89) 21 55 10 31
hello@companeer.com

© 2024 Companeer GmbH

Managing director:
Thomas Albinger
Commercial register:
Munich HRB 202961